OU blog

Personal Blogs

Weddin

Temporary Body Storage and Pandemic 2

Visible to anyone in the world
Edited by Aideen Devine, Thursday, 24 June 2021, 13:36

I had started writing this piece last week, it was speculating on what is coming next and then someone shared this information with me and I thought I’d better get this posted quickly.

One of the internet rumours about the end game in all this, is that this is about reducing the population of the world and ‘saving the planet’ by the self-appointed, global elite playing God, through an enforced vaccination programme that will wipe out millions?

Well, here’s a link to the London Borough Tender Service for Body Storage Facilities for a contract period of four years - Temporary Body Storage Service - Find a Tender (find-tender.service.gov.uk)

Here’s an excerpt - The Authority seeks to procure a framework agreement for temporary body storage in the event of an excess deaths situation for the 32 London boroughs and the City of London, led by Westminster City Council. The framework agreement will appoint a single provider and will be for a period of 4 years. This will be a contingency contract, only called upon in the event that an excess deaths situation arises in the future and existing local body storage capacity needs to be augmented.

The over-arching aim of this tender is to provide a single framework supplier that will be able to provide temporary body storage facilities to house deceased in the event of an excess deaths situation. The deceased will be stored with dignity and respect, at locations to be determined based on local London needs at the time and will require some design elements to accommodate local site conditions and constraints, while being capable of rapid deployment, construction and commissioning to an agreed standard. This framework will be procured by the Authority as the pan-London lead, but all London local authorities may call-off against the framework.

This will be a contingency cover framework and as such there is no minimum guarantee of any level of spend or call-off under the framework agreement.

The Authority will be hiring the structures and associated items, which will be decommissioned and removed at the end of the requirement.

It is a one-off contract not for recurrence.  Now, if it had said that it was a safety measure just in case, and up for renewal every four years or so, I would have thought it was just a piece of forward planning.

However, when you add it to this video of Bill Gates talking (Freudian slipping?)about pandemic 2, then I fear people, we are heading into a hell of global corporate making. You have been warned.

And keep in mind, and I'm sure people are sick of me saying it, 3 weeks to save the NHS and flatten the curve.

https://www.youtube.com/watch?v=97jyoddutfE&ab_channel=MikeKing


Permalink 3 comments (latest comment by Aideen Devine, Friday, 2 July 2021, 12:59)
Share post

This blog might contain posts that are only visible to logged-in users, or where only logged-in users can comment. If you have an account on the system, please log in for full access.

Total visits to this blog: 1665245